Ascent

Pre-Engineered Metal Buildings

VanderKodde Construction company completed a state-of-the-art pre-engineered metal building, emphasizing quality and future growth potential.

Contact Us

Location

Walker, Michigan

Architect

Ken Dixon Architects

Square Footage

15,660

Overview

Our construction company recently completed a sophisticated pre-engineered metal building (PEMB) project, showcasing our commitment to quality and innovation in design and construction. The project involved the furnishing and erecting of a state-of-the-art facility that seamlessly blends functionality with aesthetic appeal.

Project Scope

The scope of the project included:

  • Pre-Engineered Metal Building (PEMB): We provided comprehensive services from the furnishing to the erection of the metal structure. This approach ensured efficiency and precision throughout the construction process.
  • Insulated Metal Wall Panels and Aluminum Siding: The building's exterior is a mix of durable insulated metal wall panels and sleek aluminum siding, providing both energy efficiency and a modern appearance.
  • Exterior Canopy: A custom-designed exterior canopy adds both functionality and an architectural focal point, offering protection from the elements while enhancing the building's visual appeal.
  • Mezzanine Level: The interior includes a strategically designed mezzanine, expanding the usable space within the building and offering flexible options for future use.
  • Expandable Side Wall Frame: In anticipation of future growth, the structure was built with an expandable side wall frame, allowing for seamless additions when needed.

Benefits and Impact

This project stands as a testament to our ability to deliver innovative and scalable solutions tailored to meet client needs. By integrating expandable features and modern design elements, we have provided a versatile building that supports immediate operational goals while accommodating future expansion. The use of high-quality materials ensures long-term durability and energy efficiency, promising reduced maintenance costs and sustainability.

Conclusion

This project exemplifies our expertise in managing complex construction tasks with precision and foresight. We are proud to have contributed to the development of a facility that not only meets current functional requirements but also offers the flexibility to evolve with our client's future needs.